Botswana Metals 2011 Announcements
|
25 Nov 2011AGM Shareholder Presentation
2011 AGM SHAREHOLDER PRESENTATION - DISCOVERIES IN THE LIMPOPO BELT
|
|
31 Oct 2011Quarterly Activities & Cashflow Report
BML SEPTEMBER 2011 QUARTERLY ACTIVITIES & CASHFLOW REPORT
|
|
27 Oct 2011Drilling at Airstrip on IP Conductors
DRILLING AT AIRSTRIP ON IP CONDUCTORS CONFIRMS ADDITIONAL COPPER-SILVER MINERALIZATION
|
|
MORE PRIMARY MINERALISATION INTERSECTED AT AIRSTRIP COPPER AHEAD OF PLANNED DRILLING OVER OTHER KNOWN IP CONDUCTORS
|
|
DRILLING AT AIRSTRIP RECOMMENCES TO TEST PRIMARY MINERALISATION ON 5 IP CONDUCTORS AND 1 VTEM ANOMALY
|
|
DIBETE DRILLING INTERSECTS SIGNIFICANT MINERALISATION ON SEVERAL STRUCTURES
|
|
PART 2 - REVISED PRESENTATION FOR THE BOTSWANA RESOURCE CONFERENCE
|
|
PART 1 - REVISED PRESENTATION FOR THE BOTSWANA RESOURCE CONFERENCE
|
|
BML - Quarterly Report & App 5B for March 2011 qtr
|
|
27 Apr 2011Granting of PL Extensions
EXTENSION GRANTED FOR PL111/94 (DIBETE) PL54/98 (DIBETE EAST) AND PL14/2003 |
|
14 Apr 2011Drilling Recommences at Airstrip Copper, Dibete and Maibele North and Investor Presentation
DRILLING RECOMMENCES AT AIRSTRIP COPPER, DIBETE AND MAIBELE NORTH AND INVESTOR PRESENTATION
|
|
NEW "DIBETE EAST" ANOMALY EXTENSION TO BE DRILLED WITH SECOND RC DRILL RIG
|
|
22 Feb 2011Change of Interests of Substantial Holder
NOTICE OF CHANGE OF INTERESTS OF SUBSTANTIAL HOLDER
|
|
21 Feb 2011Drilling Commences at New Copper Zone
DRILLING COMMENCES AT NEW COPPER ZONE - SHASHE OLD WORKINGS IN BOTSWANA
|
|
CHANGE OF DIRECTORS INTERESTS
|
|
CHANGE OF INTERESTS OF SUBSTANTIAL HOLDER
|
|
14 Jan 2011BML - Rights Issue correction.pdf
CORRECTION TO TIMETABLE FOR RIGHTS ISSUE AND LETTER TO SHAREHOLDERS
|
|
DESPATCH OF NOTICE OF NON-RENOUNCEABLE RIGHTS ISSUE
|
|
BOTSWANA METALS LIMITED - ABN 96 122 995 073- PROSPECTUS |
|
NON-RENOUNCEABLE RIGHTS ISSUE: APPENDIX 3B
|
|
DIBETE DISCOVERY: FINAL RESULTS ON DRILL HOLE DBRC014: INTERSECTION OF 38m@1.72% Cu and 119.5 g/t Ag from a depth of 16m.
|